When Textronix needed space for 475 additional employees in the DFW market, they took an environmentally conscious approach. The Dallas Business Journal selected this project as the Best Headquarters or Corporate Campus Move of 2009. With over 100 terminal units and data center, CSC provided environmental control that was critical in achieving and maintaining the LEED Gold certification. CSC provided a LON based Honeywell building automation system, to include exterior and interior lighting control, contributing to the LEED certification of the building.

Control Systems Consultants

  • LEED: Gold
  • Enviromental Control
  • Lighting Control


Commercial


Highland Park building automation done by Control Systems Consultants

Highland Park Village Theatre

City Name

Architect:

Zero 3

MEP:

Koegel Associates

Originally built in 1935, the Village Theater was known as one of the premier movie theaters in Dallas. After extensive renovations in 2010, the theater now offers 3 screens, with two additional screening rooms, a full bar with food service and a unique seating style. All with digital sound and image. CSC provided base building controls to suit the loads and occupancy requirements for a building of this nature. Additional features of the BAS included CO2 sensors and exhaust systems dedicated to the movie projectors.

Control Systems Consultants

  • LEED: Gold
  • Base Building Controls
  • CO2 Sensor and Exhaust
  • List Item


Office Building


Maxim IP Office air monitoring  by Control Systems Consultants

Maxim IP Office Building

Carrolton

139,000 Sq. Ft.

Architect:

Corgan

GC:

Turner Construction

Located in Carrollton, TX, this unique and environmentally friendly office building tied into an existing central plant and control system. In addition to standard building automation, CSC provided outside air monitoring, CO2 sensors & control, and other features that enhanced the design / construction team’s ability to obtain a certified LEED rating.

Control Systems Consultants

  • LEED: Silver (pending)
  • Outside Air monitoring
  • CO2 Sensors & Control


Office Building


McLane Food Corporate HQ automation by Control Systems Consultants

McLane Foods Corporate Headquarters

Temple

48,000 Sq. Ft.

Architect:

Leo A. Daly

Mechanical Contractor:

City Wide Mechanical

Built to reflect the quiet of Bell County were it resides, this headquarters building for one of the largest grocery distribution chain in the world CSC installed a Johnson Control N2 system with zoned reheat and a central plant that also serves other parts of the McLane Campus.

Control Systems Consultants

  • Johnson Conrol N2 System
  • Zone Reheat
  • Central Plant


Office Building


Oncor HQ LEED: Gold MODBUS by Control Systems Consultants

Oncor Headquarters Building

Dallas

270,000 Sq. Ft.

Architect:

Coorgan and Associates

MEP:

Blum

When Oncor Energy expanded operations, they took over this 8 story, class A office building in the heart of the Dallas Arts District. Oncor opted for a complete renovation down to the shell and core. CSC not only provided LON controls the shell and core, finish out and central plant, but also installed MODBUS interfaces for UPS & new and existing generators, ensuring that the building can remain operational even under the harshest of North Texas Extreme Weather Events.

Control Systems Consultants

  • LEED: Gold
  • Central Plant
  • MODBUS Interfaces For Generators


Bank


Comerica Bank Lighting Automation & Energy Management by CSC

Comerica Bank

Architect (multiple):

Moran & Murphy Architects
Brand-Sayers inc.

Commissioning Agent:

Air Engineering

MEP (multiple):

Mycon Engineering
Koegel Engineering

GC: (multiple):

Koegel Engineering
Turner Construction


Multiple Locations:

  • Round Rock
  • Irving
  • Surgarland
  • Austin
  • Houston
  • Dallas

Control Systems Consultants worked on over a dozen locations across the state of Texas, in both existing buildings and new construction. A variety of building automation products were used, and the energy management demands for each project was unique. Some of the projects were LEED certified. To this end CSC facilitated the LEED certification process by providing lighting control, outside air monitoring, VRV integration and metering and verification of electrical systems.

Control Systems Consultants

  • LEED: Various
  • Energy Management
  • Lighting Control








Office Building


LCCC System upgrade & Service Agreement by Control Systems Consultants

Las Colinas Corporate Center (Shell & Core Upgrade / Finish-Out)

Las Colinas

385,741 Sq. Ft.

Architect:

BOKA

Property Manager:

Piedmont

MEP:

CCRD

Located in the heart of Las Colinas at the intersection of highways 161 and 114 in one of the busiest corporate headquarters locations in the United States. Tenants include Nokia, Solomon Edwards, Tek Systems & Allegis Group. CSC has provided both system upgrades, tenant finish outs & service agreements to the existing Johnson Controls Building automation system. In fact, CSC is the preferred control contractor for this location.

Control Systems Consultants

  • System Upgrades
  • Tenant Finish Outs
  • Service Agreements


General Commercial


Lifetime Fitness Building Automation by Control Systems Consultants

Lifetime Fitness

2,000,000+ Sq. Ft.

MEP (multiple):

Emanuelson-Fodas Inc.

GC:

FCA Constructing


Multiple Locations:

  • Columbia, MD
  • Phoenix, AZ
  • Dublin, OH
  • Garland, TX
  • Plano, TX
  • Colleyville, TX

Averaging 110,000 square feet per center, Lifetime Fitness is the premier fitness facility in the United States and abroad. These facilities everything from weight lifting, stationary bikes, basketball & racquet ball courts, to aerobic & pilates studios to the largest most complex indoor and sometimes outdoor swimming pools around. This presents a unique demand for both the HVAC and automation systems that control them. CSC was proud to be selected to provide this service on a nationwide basis. In addition to specific ventilation and humidity controls, CSC was also tasked to provide non-standard features such as chlorine alarming and ventilation.

Control Systems Consultants

  • Ventilation
  • Humidity Controls
  • Chlorine Alarming


General Commercial


Stein Mart Remote Monitoring & Energy Management by CSC

Stein Mart

500,000+ Sq. Ft.

Architect (multiple):

KBJ Architects Inc.
PPC Architects

GC (multiple):

The Korte Company


Multiple Locations:

  • Austin
  • Lubbock
  • Amarillo
  • Dallas
  • Tyler
  • Hurst
  • Plano
  • San Antonio
  • Pensacola, FL
  • Baton Rouge, LA
  • St. Louise, MO

With over two-hundred and sixty locations in over 29 states, this Florida based retailer is located primarily in the southern United States and Texas. Texas is Stein Mart's largest single state market with over $53 million dollars in annual profits. This retail giant expanded aggressively in Texas and CSC was happy to assist in accommodating this growth. CSC provided and installed Philips Teletrol system for all locations, enabling remote monitoring and energy management and savings between 18% to 30% annually over stand-alone environmental control systems.

Control Systems Consultants

  • Philips Teletrol System
  • Remote Monitoring
  • Energy Management